Probationary Acceptance and Final Acceptance of Stormwater Public Improvements
Part of the acceptance process for SEMSWA Stormwater Public Improvements includes the completion of As-Built documents. To help prepare As-Builts, please refer to the following. As-Builts are required for submission to SEMSWA for any case in the City of Centennial that has been issued a SPIP, and should be submitted prior to Probationary Acceptance along with the Acceptance Form that can be found below.
Record Drawing Preparation ChecklistRecord Drawing Certification BlockRecord Drawing ExampleAcceptance Form