Skip to main content

Operations and Maintenance Agreement for Permanent Water Quality Control Measure Facilities

Operation and Maintenance (O&M) Agreement and Site Plan Information

Standard Operating Procedure documents have been prepared for each SEMSWA Standard Post Construction Control Measure to assist with inspection and maintenance protocols.   The Design Engineer will prepare an Operations and Maintenance Site Plan to accompany the Operation and Maintenance Agreement for all post construction water quality facilities using the SEMSWA provided checklist.   All O&M documents will be recorded with Arapahoe County Clerk and Recorder.

Operations & Maintenance Agreement

Checklist for Operations & Maintenance Site Plans

Operations & Maintenance Site Plan Checklist

Standard Control Measure Facility Details

SOPs for Inspection / Facility Maintenance

Extended Detention Basin Standard Operating ProceduresGrass Buffer - Grass Swale Standard Operating ProceduresBioretention - Rain Garden - Porouse Landscape Detention Standard Operating ProceduresSand Filter Basin Standard Operating Procedures